Projects

Avesoro is taking a pioneering role in the extraction of valuable minerals with a vision to sustainably manage natural resources. By utilizing innovative technology and minimizing environmental impact, it has completed the design of several new mining projects and is preparing them for operation. These projects not only strengthen our leadership in the industry but also reflect our commitment to fulfilling environmental and social responsibilities.


Gondoja

Our exploration team has conducted the studies on two phases. During the first phase, our team successfully completed 171 drill holes. This initial drilling campaign allowed us to identify key gold-bearing zones and gather crucial geological data, laying the groundwork for more detailed exploration. Building on the success of Phase 1, we have embarked on Phase 2, with an additional 111 drill holes completed. This phase focused on delineating the extent of the gold deposits and refining our understanding of the ore body. Advanced techniques and state-of-the-art equipment are employed to ensure precise and reliable results.

Project Features

Location: Liberia
Resource (Cut off Grade Au > 1 g/t)
Indicated: 1,477,191 t @ 2.50 g/t Au, 118,505 oz
Inferred: 2,623,038 t @ 2.40 g/t Au, 202,487 oz
Estimated Life of Mine: 3 years