New Liberty is the key asset in Avesoro Resources’ portfolio is the New Liberty Gold Mine, which is Liberia’s first and largest commercial gold mine. Construction at New Liberty commenced in April 2014, with first gold poured from the process plant on 31 May 2015 and gold sales commencing in August 2015. Commercial Production was declared at New Liberty on 1 March 2016.

The New Liberty ore is hosted in a steeply dipping shear zone in ultramafics and amphibolites.

The New Liberty operation consists of two worked-out open pits, an underground mine with three separate portals and a large processing plant with tailings dams. All the ore mined in the region is processed through the New Liberty plant which has an industry standard flowsheet consisting of a three-stage crushing, milling, gravity separation and carbon in leach plant.

  • Three stage crushing primary jaw, secondary cone, tertiary cone
  • 2 x Ball mill – 3.2 MW drive each - 475 tph total
  • 3 x Vertical mill 1 MW drive each
  • Mill Capacity 4 Mtpa crushed ore.
  • Conventional gravity circuit with centrifugal concentrator
  • 3 parallel CIL circuit
  • 93 – 95% recovery overall
  • TSF 1 – 120 Ha with waste rock perimeter walls.
  • TSF 2 – 250 Ha under construction

The mining is focused on the steeply dipping, deeper ore, under the worked-out open pits. This is extracted by underground operations, accessed by three portals (Larjor, Kinjor and Marvoe) developed into the sides of the open pits.

New Liberty UG Mine (August 2020 - On Going)

  • Three Different Underground Decline at New Liberty (Larjor, Kinjor, Marvoe)
  • Two different Sublevel Stope mining method is applying at New Liberty UG; (Transverse and Longitudinal)
  • Total Lateral Development has reached about 33 km
  • Deepest underground portal has reached the final vertical depth (460m)
  • Project-to-date production:
    • Total mined: 4.7M tonnes
    • Total ore: 3.5M tonnes
    • Average ore grade mined: 2.85 g/t gold
    • Total waste: 1.3M tonnes

New Liberty Open Pit Mine (October 2014 to June 2022)

  • Pits Width Lengths are: Larjor: 320 m, Kinjor-Marvoe: 500 m
  • Length of Pits: Larjor: 615 m, Kinjor-Marvoe: 1.5 km
  • Open pit has reached the final depth (245m)
  • Project-to-date production:
    • Total mined: 165M tonnes
    • Total ore: 9M tonnes
    • Average ore grade mined: 2.79 g/t gold
    • Total waste: 156M tonnes

Key Facts

Mine Type

OP/UG

Metals Mined

Gold

Deposit Type

Orogenic Gold

Production Type

Surface Mining at OP / Sublevel Stope Mining at UG

Process Type

CIL (Average Recovery 93% - 95%)

Remaining Life Of Mine

OP is Completed. For UG, based on proven and probable reserves, the remaining life of undergrounds mid of 2027

2023 Production Physicals

1.75Mt @2.91 g/t, 160KOz

Processing

The 3.9M tonnes per annum processing plant at New Liberty comprises two parallel but interconnected CIL circuits, giving excellent resilience and flexibility.

All of the ore from the surrounding mines is processed through this central plant.

The first circuit (known as MAPA 1) was commissioned in 2014 when the New Liberty mine was developed. The second circuit (MAPA 2) was commissioned in 2021. A further upgrade was made to expand the capacity of the leach circuit and this was commissioned in early 2022.

The tailings storage facility (TSF) at New Liberty is in the process of being expanded.

In 2023 the plant produced 360k ounces of gold. The bullion with a high level of purity is exported for further refining and sale.