The Republic of Liberia is situated on the coast along the south-west corner of West Africa, bordered by Sierra Leone, Guinea and Cote d’Ivorie. It is Africa’s oldest republic, founded by freed American and Caribbean slaves in 1847. It has had democratically elected governments since 2006. It has robust mining laws based upon well-established Australian system and a pro-mining government. The region is under-explored for gold.
The company has five operational underground gold mines and one open-pit project is currently in state of development in Liberia.
- New Liberty Gold Mine
- Ndablama Gold Mine
- Weaju Gold Mine
- Matambo Gold Mine
- Kokoya Gold Mine
Our Capacity
Open Pit Mining
- Fully fledged operational capabilities: Drill & blast, Loading, Haulage, Dewatering
- Open pit operations completed at NLGM and Ndablama mine sites, almost about to commence at Matambo mine site
- Daily production capacity: 32,500 BCM/day
- Daily drilling capacity: 50,00 m/day
- Peak number of employees: 1500+
- Number of mining equipment items: 120+
Underground Mining
- Operational capabilities: Drill & blast, loading, haulage, backfilling, ventilation, anchor supporting, dewatering)
- 5 underground mine operations ongoing (Larjor, Marvoe, Kinjor, Weaju and Ndablama)
- Daily production capacity: 4,500 tonnes/day (all UG operations)
- Daily advancement capacity: 100 m/day (all UG operations)
- Number of employees: 500+
- Number of mining equipment items: 150+
Processing
NLGM has Processing Plant with the 3.9M tonnes per annum capacity consisting of Crushing & Milling, CIL & Elution, Gold Room and tailings storage facility. All of the ore from the surrounding mines is processed through this central plant. The TSF is in the process of being expanded. In 2023 the plant produced 360k ounces of gold. The bullion with a high level of purity is exported for further refining and sale.
-
Crushing & Milling
- Total crusher & milling capacity: 11,500 tpd
- 2 x Jaw crusher
- 4 x Cone crusher
- 2 x Ball mill
- 3 x Vertimill
-
CIL & Elution
- 3 x Pre-ox tank
- 18 x Leach tank
- Elution Circuit Capacity: 5 tonnes of Carbon Per elution batch
-
Gold Room
- Full-scope gold refining and pouring capacity
- Overall gold recovery rate: 94%
-
Tailings Management
- In-house construction and maintenance capability
- Water level management to ensure safe freeboard
- In-place instrumentation for stability
- Perimeter monitoring boreholes
- Construction Quality Assurance (CQA)
- Engineer of Record (EoR)
- Development of 30Mton capacity TSF-2 project
-
Plant Maintenance
- Fully fledged maintenance capacity
- Preventive maintenance
- Periodical maintenance
- Achieved crushing availability: 87%
- Achieved milling availability: 96%
- Cold and hot commissioning
Heavy Mining Equipment (HME) Workshops
Well-equipped Heavy Mining Equipment (HME) workshops have been built at the key mining locations for servicing and repairs. There are over 700 items of equipment in the Machine Park.
Workshop capabilities include:
- Periodic, Corrective, Predictive and Proactive Maintenance
- Repair
- Parts Machining
- Bodywork
- Welding
Transport/Ore Haulage
In addition to the mining equipment, the company also runs a fleet of about 100 32 and 50 tonnes payload tipper trucks for transporting ore from the Ndablama and Weaju mines to the processing plant at New Liberty. The road trucks are also used to transport bulk items from the main ports to site as needed.